Customization: | Available |
---|---|
Type: | Lighting |
Structure: | Protection |
Still deciding? Get samples of US$ 500/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Advantages
Authoritative product certification: ISO, CE, CCC, etc
- Perfect SQA quality management system to ensure high quality products
- Quick quotation, can provide electrical design services
- The delivery period is short, and the fastest delivery time is 10-15 days worldwide
- Perfect after-sales service system, so that customers buy worry-free
- Welcome customers to visit the factory guidance, provide OEM/ODM
If you are interested in becoming our company's foreign agent,please contact us!
Product Name | Distribution Cabinet |
Keywords | Power Distribution Cabinet |
Model | GGD1 GGD2 GGD3 |
Rated Voltage(V) | 380 V |
Rated Current(A) | 1000/600/400,1500/1000,3500/2500/2000 |
Frequency(HZ) | 50 HZ |
Rated Short-Circuit Breaking Current | 15/30/50 KA |
Rated Short-Time Withstand Current | 15/30/50 KA |
Rated Peak Withstand Current | 30/63/105 KA |
Material | Cold Rolled Sheet |
Number of Poles | 3-phase 4-wire system, 3-phase 5-wire system |
Installation Meth | Indoor Installation |
Application | Electric Power Transmission |
OEM | Available |
MOQ | 1 Set |
Jiangsu Liyang Electrical Appliance Manufacturing Co., Ltd. is located at No. 39 Xinjian North Road, Chengbei Industrial Park, Jingjiang City, Jiangsu Province, National Economic Development Zone.
Liyang Electric Appliances has taken off with the development of China's power industry. Founded in 1963, the company has gone through Jingcheng Weaving Society, Jingcheng Daily Necessities Factory, Jingcheng Electric Appliance Factory, Jingjiang Electromechanical Transformer Factory, Jingcheng Electric Control Equipment Factory, as well as the interpretation of Jiangsu Xingxing Electric Appliance Manufacturing Co., Ltd. and the development of Jiangsu Liyang Electric Appliance Manufacturing Co., Ltd. Up to now, it has begun to take shape and covers a total area of 50000 square meters with fixed assets of 130 million yuan. It is a designated production and transformation equipment of State Grid, the former Ministry of Coal and Chemical Industry, a complete set of high and low voltage switchgear distribution devices, box type substations, fully enclosed anti-corrosion transformers, oil immersed/dry/amorphous alloy transformers, and boundary intelligent high-voltage metering. A specialized company for boxes. After 50 years of carrying heavy responsibilities and 50 years of glorious history, Liyang Electric Appliances has walked a rugged and extraordinary path, creating infinite vitality for the growth of the enterprise.
The company has advanced production and testing equipment (MT-300E CNC servo turret punch, CNC hydraulic plate bending machine, CNC hydraulic gate shearing machine, CNC punching machine, CNC lathe, CNC drilling machine, CNC busbar punching and shearing machine, comprehensive testing system for transformer characteristics, CNC foil winding machine, CNC vacuum drying equipment, CNC pressure casting equipment, etc.), strict process control, and perfect after-sales service. It is a modern high-tech enterprise integrating research and development, manufacturing, sales, and installation in the field of high and low voltage transmission and distribution, as well as the Taizhou Photovoltaic Power Generation Transmission and Transformation System Engineering Technology Research Center and Taizhou Engineering Research Center.
Payment Term
Payment Terms | T/T | EXW | 30% T/T in advance, the balance to be paid before dispatch |
FOB | |||
CIF | 30% T/T in advance, the balance to be paid against the copy of B/L | ||
CFR (C&F) | |||
L/C | Irrevocable L/C at sight could be accepted if amount above US $50,000.00 | ||
Delivery Time | 7 to 10 working days after receiving advanced payment |