Customization: | Available |
---|---|
Type: | Power |
Structure: | Protection |
Still deciding? Get samples of US$ 1200/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Advantages
Authoritative product certification: ISO, CE, CCC, etc
- Perfect SQA quality management system to ensure high quality products
- Quick quotation, can provide electrical design services
- The delivery period is short, and the fastest delivery time is 10-15 days worldwide
- Perfect after-sales service system, so that customers buy worry-free
- Welcome customers to visit the factory guidance, provide OEM/ODM
If you are interested in becoming our company's foreign agent,please contact us!This series of intelligent box substation is by the high voltage unit, power transformer, low voltage unit, measurement unit and intelligent system, optimize the combined into a complete intelligent power supply complete sets of equipment, its function, wide use, more safe and reliable operation, nice appearance, and has convenient installation, covers an area of less, less maintenance, less investment, quick effect, long service life, etc. It can be used as transformer and distribution equipment for urban buildings, residential areas, municipal facilities, factories, mines, highways, wharves, oil fields and temporary electricity departments and places.
Working Environment
1. Ambient temperature: -25ºC~+40ºC
2. Altitude: no more than 1000m
3. Relative humidity:
Daily average less than 95% Average value of water vapor pressure less than 2.2kpa
Monthly average less than 90% Average value of water vapor pressure less than 1.8kpa
4. Seismic intensity:less than magnitude 8
5 .Outside wind speed less than 35m/s
6. Place Installation : Apply to the places have no fire,no explosion danger and no chemical corrosion .
We can produce this substation as customer's requirement according to their drawing and need.
Rated capacity (kVA) |
Voltage combinations | The join group designator | No-load loss (W) |
Load loss (W) |
Impedance voltage (%) |
No-load current (W) |
||||
high pressure(kV) | Taps(%) | Low voltage(kV) | ||||||||
30 | 6 6.3 10 10.5 11 |
±5% or ±2x2.5 |
0.4 | Dyn11 orYyn0 |
80 | 600/630 | 4.0 | 2.3 | ||
50 | 100 | 870/910 | 2 | |||||||
63 | 110 | 1040/1090 | 1.9 | |||||||
80 | 130 | 1250/1310 | 1.9 | |||||||
100 | 150 | 1500/1580 | 1.8 | |||||||
125 | 170 | 1800/1890 | 1.7 | |||||||
160 | 200 | 2200/2310 | 1.6 | |||||||
200 | 240 | 2600/2730 | 1.5 | |||||||
250 | 290 | 3050/3200 | 1.4 | |||||||
315 | 340 | 3650/3830 | 1.4 | |||||||
400 | 410 | 4300/4520 | ||||||||
500 | 480 | 5100/5410 | 1.2 | |||||||
630 | 570 | 6200 | 4.5 | 1.1 | ||||||
800 | 700 | 7500 | 1 | |||||||
1000 | 830 | 10300 | 1 | |||||||
1250 | 970 | 12000 | 0.9 | |||||||
1600 | 1170 | 14500 | 0.8 |
Payment Terms | T/T | EXW | 30% T/T in advance, the balance to be paid before dispatch |
FOB | |||
CIF | 30% T/T in advance, the balance to be paid against the copy of B/L | ||
CFR (C&F) | |||
L/C | Irrevocable L/C at sight could be accepted if amount above US $50,000.00 | ||
Delivery Time | 7 to 10 working days after receiving advanced payment |